Direct answer: specify the activity and performance before selecting the product
The brief should define who uses the space, for what activity, for how long and with what privacy, comfort, accessibility and technology needs. Then compare a proprietary booth with a constructed focus room against the same criteria. A booth may offer speed, repeatable product data and future relocation; a built room may provide more freedom in size, finishes and integration. Neither is automatically the better acoustic or operational answer. Procurement should follow a coordinated review of speech reduction evidence, ventilation, power and data, doors, visibility, life-safety interfaces, placement, maintenance and responsibility for installation and verification.
Separate phone calls from sustained focus work
A short private call has different requirements from a 90-minute video meeting, confidential conversation or concentrated desk task. Estimate demand by activity and duration, not simply by headcount. Note whether users need a seat, height-adjustable work surface, screen, camera position, task light, laptop power, wired data or space for documents. Decide how the room will be found and booked, and whether staff expect spontaneous access. A workplace can own many booths and still lack the right support if every unit serves the same short call. The schedule should name the role of each space and the assumption used to size the mix.
Ask for comparable acoustic evidence
Use a stated performance brief rather than words such as soundproof. ISO 23351-1 provides a laboratory method for comparing the reduction of speech level by furniture ensembles and enclosures. Request the applicable test reference, configuration and current product data, then ask the acoustic adviser how the result relates to the intended privacy and surrounding office. A constructed focus room uses a different assembly and may require review of partitions, door seals, glazing, ceiling, floor and service penetrations as one system. Laboratory data supports comparison; it does not by itself predict every installed condition or user experience.
Coordinate air, power, data and heat loads
An occupied enclosure needs an appropriate comfort strategy. For a proprietary booth, check manufacturer airflow, operating modes, required clearance around grilles, controls, noise and maintenance access. For a built room, the project’s building-services team should design and coordinate ventilation and cooling for the intended occupancy and duration. Record power socket types, charging, data, display or camera requirements, lighting controls and cable routes. Avoid assuming a plug connection resolves every interface. Heat from people and equipment, background noise and stale air can make an acoustically capable space unusable long before a formal capacity limit is reached.
- Occupancy and expected session length
- Airflow and clearance data
- Power, USB and data configuration
- Lighting and video-call needs
- Service access and replacement responsibility
Test placement in the whole office
Place booths where they are convenient without turning them into obstacles or noise beacons. Check approach, door swing, transfer and turning needs, visibility, wayfinding and the effect on nearby desks. Review ceiling height, floor loading, sprinkler and detector coverage, emergency systems, escape routes and landlord constraints with the relevant professionals. A glass door can improve visibility but may need manifestation or privacy treatment; a solid location may feel discreet but create a hidden corner. Include cleaning access and the route for delivery, assembly, relocation and removal. The floor plan should show the selected model or actual constructed dimensions, not a generic box.
- Clear approach and surrounding circulation
- Door operation and user visibility
- Life-safety and ceiling-service interfaces
- Delivery, assembly and future relocation route
- Cleaning and maintenance access
Planning example
Planning example: a fictional 80-person hybrid office reports frequent short calls and a smaller need for confidential one-to-one work. The first proposal uses six identical single-user booths. The brief review instead defines four call points for sessions under 20 minutes, one accessible enclosed focus room for longer individual work and two existing meeting rooms with improved booking rules. Product evidence, ventilation clearances and socket options are checked for the booths; the constructed room is coordinated through the partition, door, ceiling and services design. The mix uses different spaces for different activities and is then shown in the workplace plan. The scenario demonstrates the comparison method.
- Demand: frequent short calls
- Gap: longer and more accessible focus use
- Response: mixed booth and room types
- Proof: product data plus coordinated room design
Pre-procurement comparison checklist
Compare shortlisted options in a single schedule. Record evidence and exclusions so price is evaluated against the same performance and scope.
- Activity, users, session length and demand are defined
- Internal dimensions, furniture and accessibility are reviewed
- Acoustic test method and configuration are recorded
- Ventilation, lighting, power and data are confirmed
- Placement and life-safety interfaces are professionally reviewed
- Delivery, installation, testing and defects responsibilities are assigned
- Cleaning, filters, spare parts and maintenance are understood
- Relocation, reuse and end-of-life assumptions are compared
Limitations and the next useful step
A product datasheet cannot replace a workplace demand study, acoustic advice, building-services design or project-specific code and landlord review. Users may also experience comfort and privacy differently, so a showroom trial or pilot can be valuable when the purchase is significant. Do not quote one acoustic number without its method or compare unlike test results. The next useful step is a two-column performance schedule—proprietary booth versus constructed room—using the actual floor location and activity brief. Ask each supplier and consultant to fill the same evidence fields, record exclusions, and close every ceiling, service, technology and installation interface before issuing the purchase order.