Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
DESIGN STUDY / 02

A room for focused conversation

An original office design & fit-out concept exploring how material, proportion and practical use can work together.

A room for focused conversation — original design concept
Original design concept · Forma Workplaces

The brief

Workplaces designed around people, technology and the move-in programme. This study explores a setting where daily use and a clear visual language guide the design together.

The design thinking

Forma is the workplace specialist within Fitworks. We connect the needs of people with the realities of a floorplate, the technology they use and the programme needed to make a move work. The concept brings that approach into a spatial idea, using a restrained material palette and clear relationships between the main elements.

From concept to your property

A visual direction is the beginning of a conversation. Translating it into a project requires measured information, a site review, specialist coordination and an agreed specification.

  • Shell condition and workplace density
  • Meeting rooms and acoustic requirements
  • Furniture, IT and AV responsibilities
  • Phasing and move-in constraints
Develop a brief like this
THE STUDY IN DETAIL

A closer look at the detail.

The workplace must coordinate acoustics, furniture, IT, AV and building services around the way each room is used.

Original design concept

Concept: workplace redesign

The detail study narrows the wider brief to a room for focused conversation. Balance concentration, conversation and teamwork with a plan based on actual work patterns rather than headcount alone.

Design decisions

  • Agree focus, meeting and support-space needs before the test fit.
  • Treat room privacy as a complete construction requirement.
  • Plan refurbishment phases and the move with the operating business.
PROPOSED PROJECT TIMELINE

From the first brief to handover.

A proposed sequence for this design study. External review periods, site conditions and supplier lead times are confirmed for each commissioned project. Some stages may overlap.

  1. Stage 1

    Discovery & measured brief

    Balance concentration, conversation and teamwork with a plan based on actual work patterns rather than headcount alone.

    Review point · A scope and responsibility record
  2. Stage 2

    Design & coordinated specification

    Agree focus, meeting and support-space needs before the test fit.

    Review point · A reviewed drawing and specification package
  3. Stage 3

    Selections & procurement planning

    Treat room privacy as a complete construction requirement.

    Review point · A selection register and supply responsibilities
  4. Stage 4

    Proposed delivery sequence

    Plan refurbishment phases and the move with the operating business.

    Review point · Staged inspections and change records
  5. Stage 5

    Review & handover planning

    Review the agreed scope and record outstanding items before completion is accepted.

    Review point · A snagging list, care information and agreed close-out
SPECIFICATION & QUALITY

Details that can be reviewed.

Concept palette

  • Navy acoustic upholstery
  • Warm timber tables
  • Clear glass with considered privacy treatment

Proposed quality records

  • A workstyle and room-use brief
  • Furniture, IT and AV responsibility schedules
  • Agreed acoustic, service and occupation checks

The concept aims for a coordinated and usable space. Performance requirements, cost and completion milestones are agreed for each commissioned project.

Our project standards
YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your office design & fit-out brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry