The direct answer
An office parcel and mail-delivery brief should connect the building arrival route with secure handover to the recipient. Before layout freeze, settle typical and peak volumes, delivery hours, acceptance authority, verification, sorting, storage sizes, notification, hybrid-working delays, accessible collection, oversized and sensitive exceptions, returns, waste and operational ownership. The space can be a staffed counter, secure room, lockers or a hybrid. Choose it from the actual workflow rather than hiding shelves behind reception and assuming the receptionist will solve every delivery.
Measure volume and dwell time
Count letters, courier envelopes, food or flower deliveries, small parcels and oversized boxes separately. Record busy weekdays, seasonal peaks and how long items remain before collection. Hybrid attendance changes dwell time even when headcount stays constant. A twenty-parcel day collected within hours needs less storage than ten parcels left for a week. Include company deliveries, employee purchases and returns only if policy allows them. The brief should state what the office accepts, what it refuses and who handles an item when the named recipient is absent.
Map the chain of custody
Define the sequence from courier arrival to recipient collection: building security, reception, verification, logging, label or photograph, placement, notification, identity check and final handover. Decide which steps need an audit trail and which information must remain private. Keep unattended parcels away from public circulation and do not expose recipient names on an open shelf. A secure collection process matters even without smart technology. The layout should support the procedure with a clear staff side, controlled storage and a collection point that does not disrupt visitor check-in.
Choose storage by item mix, not locker count
Use several compartment sizes and reserve an overflow zone for awkward items. Steelcase office lockers show how mail slots and identification can be combined with personal storage, while parcel specialists offer indoor lockers, oversized compartments and controlled package rooms. Those are different operating models. Compare staffed shelving, assigned lockers, dynamic smart lockers and a controlled room against volume, security, available wall length and support responsibilities. Do not fill the plan with small doors if most of the space is lost to a few large boxes.
Coordinate technology and accessible collection
Smart lockers can need power, network, screens, scanners, software administration and a service agreement. Confirm who operates the system when a compartment fails or a user cannot retrieve an item. Position controls and collection doors with the project’s accessibility review, clear floor space and reach ranges in mind. Dubai Municipality publishes the Dubai Universal Design Code and related accessibility assessment guidance. The exact solution remains project-specific; technology should not create a new barrier for a visitor, employee or courier.
Plan sorting, returns and daily housekeeping
Provide a counter or shelf for scanning, labelling and temporary sorting without placing parcels on the reception desk. Include consumables, a secure location for undelivered items, return labels where relevant and a defined waste stream for cardboard and packaging. Keep fire routes, electrical cupboards and accessible circulation free of overflow. If deliveries include food, flowers, medicine or temperature-sensitive items, define acceptance limits and an immediate notification route rather than treating them as ordinary parcels. Facilities and security should agree the escalation procedure.
Planning example
Planning example: a hybrid office has 120 employees but only 55 present on a typical day. Parcel counts are modest, yet items often remain for three days. The first plan provides twelve identical lockers beside reception. A two-week sample shows that half the deliveries are courier envelopes, while several boxes exceed the locker depth. The revised brief uses shallow mail slots, eight mixed-size secure lockers and a controlled overflow cupboard. Reception logs arrivals, recipients receive a notification and uncollected items escalate after an agreed period. The collection zone remains outside the visitor queue.
Buyer checklist before layout freeze
Test the layout with the operating procedure and a sample of real package sizes.
- Typical, peak and retained volumes measured
- Accepted and excluded delivery types defined
- Courier arrival and recipient collection routes mapped
- Verification, logging and notification ownership assigned
- Mixed sizes and overflow storage provided
- Privacy, security and uncollected-item escalation agreed
- Accessible controls, doors and clear floor space reviewed
- Returns, packaging waste and service support planned
Limitations and next step
This guide does not set security policy, data-retention rules or accessibility compliance for a specific office. Those depend on the organisation, building, selected system and current requirements. The next step is to run a short parcel-volume study and a workflow session with reception, facilities, security and workplace design. If lockers are proposed, obtain current product dimensions and service requirements before layout approval. Sign off both the physical plan and the operating procedure, because storage without ownership will quickly become an unmanaged overflow area.
Sources & further reading
Make this useful for your project.
A review of your property and priorities can turn general guidance into a defined brief.
Explore Workplace planningDiscuss your project


