The direct answer
An office tea-point brief should describe the operating day before it describes the cabinetry. Before joinery manufacture, settle who uses the space and when, beverage and food offer, exact appliances or envelopes, electrical loads, water and drainage, ventilation, storage, waste sorting, cleaning, accessibility, queueing, acoustics and maintenance access. The right tea point is not the one with the longest counter; it is the one that supports peak use without blocking circulation, exposing electrical accessories to water or making daily cleaning and appliance replacement unnecessarily difficult.
Model the busiest ten minutes
Headcount alone misses how tea points actually become congested. Identify arrival patterns, lunch use, prayer or meeting breaks, catered events and end-of-day cleaning. Then map a realistic peak: one person at the coffee machine, one at the sink, one opening the refrigerator and another approaching waste. Show door swings and queues on the plan. If a single aisle cannot support that pattern, separate beverage, washing and disposal points or reduce conflicting doors. The exercise also reveals whether an adjacent social zone needs a different route from the working kitchen line.
Freeze appliances or define honest envelopes
List coffee machine, grinder, kettle or boiler, microwave, refrigerator, dishwasher, water dispenser and any vending equipment. Record model dimensions, door swing, heat rejection, ventilation clearance, electrical load, water and drain requirements, refill method and service zone. Countertop machines still affect sockets, splash exposure and overhead cupboards. Built-in appliances need removable panels and manufacturer clearances. Where exact models are not chosen, use a deliberately generous envelope and require final supplier data before manufacture; a generic appliance symbol is not enough.
- Model and current technical data
- Connection and isolation requirements
- Heat, ventilation and clearance needs
- Door, refill and service access
Coordinate water, drainage and electrical safety
Place the sink, filtered-water equipment and plumbed appliances on one coordinated services drawing. Confirm isolation, traps, drainage falls, leak response and access without converting the base cabinet into unusable storage. DEWA’s published electrical regulations address separation and protection where water is regularly used, and current project requirements must be applied by qualified designers and contractors. Do not improvise extension leads or concealed adapters inside joinery. Check the whole simultaneous electrical load, dedicated circuits where required, appliance isolation and a practical route for inspection and replacement.
Plan storage from replenishment and cleaning
Separate daily-use cups, tea and coffee from bulk cartons, cleaning chemicals and waste consumables. Measure the actual cup sizes, trays, water bottles and catering equipment. Heavy stock belongs where it can be reached without overloading high shelves. Cleaning chemicals should follow the workplace’s safety arrangements and should not share casual food storage. Provide a home for drying items and for the cloths, brushes or dishwasher products used each day. If the facilities team replenishes from a central store, include trolley approach, unpacking space and a route that does not cross focused work areas.
Resolve waste, odour, noise and nearby work
Tea points generate glass, cans, food residue, coffee grounds, packaging and general waste. Decide the sorting streams from the building’s actual collection system, then size bins for removal frequency and bag handling. Ventilation and cleaning are operating issues, not decorative extras. Coffee grinders, ice, microwaves, dishwashers and conversations can disturb nearby desks or meeting rooms, so locate the tea point within the workplace acoustic strategy. Steelcase’s WorkCafé planning material treats nourishment areas as social and work destinations; that benefit needs zoning rather than assuming every adjacent seat is quiet.
Planning example
Planning example: a hybrid office of 70 people expects about 40 people on a busy day, with the largest rush after a weekly all-hands meeting. The first plan places the refrigerator, coffee machine, sink and waste in a single 2.4 metre run beside a focus area. A ten-minute flow test shows colliding refrigerator doors and a queue across circulation. The revised plan moves waste to the exit end, separates coffee from washing, uses an undercounter refrigerator with a clear opening zone and adds a small standing ledge on the social side. Appliance loads and service access are then coordinated before joinery release.
Buyer checklist before manufacture
The tea-point approval should be an operational sign-off, not only a finish approval.
- Peak use and queueing tested on plan
- Appliance schedule and replacement envelopes confirmed
- Power, water, drainage and isolation coordinated
- Sink and electrical accessories safely separated
- Ventilation and heat clearances checked
- Daily and bulk storage inventory allocated
- Waste streams and removal route agreed
- Cleaning, leak response and service panels shown
- Accessible approach and controls reviewed
Limitations and next step
This guide does not determine electrical circuits, plumbing sizes, ventilation rates or authority approvals for a specific office. Those depend on the tenancy, building, appliance data and intended food activity. The next step is to hold a short coordination review with workplace design, facilities, building management and the relevant services specialists. Issue one signed appliance schedule and one joinery-services elevation. If equipment may change, record the allowable envelope and change-control deadline so a late coffee machine or dishwasher choice cannot silently invalidate the manufactured counter.