Direct answer

Before office partitions close, a display and whiteboard-wall brief should define room use, user positions, display and writing-surface sizes, mounting heights, backing and fixings, wall construction, equipment and panel weights, power and data, cable pathways, ventilation, camera or soundbar zones, controls, marker trays, reach and accessibility, cleaning, replacement and future change. Product weights and mounting systems vary widely. Steelcase lists wall-mounted whiteboards with defined sizes, weights and concealed mounts, while its Ocular Frame coordinates display and camera mounting. The brief must therefore connect exact products or verified allowances to the partition detail instead of adding a generic plywood backing note after furniture and services are fixed.

    Classify the wall by activity

    Decide whether the wall supports presentation, hybrid meetings, team planning, training, daily scheduling, pin-up review or several modes. Record typical group size, seated and standing positions, camera use, content type and whether the wall is a focal point or background. A boardroom display wall needs different sightlines and technology from a project room covered in writable surfaces. Test the view from every seat and the standing reach of intended users. Keep doors, blinds, low cabinets and circulation clear. A visually centred screen can still be poorly placed if the table, camera or daylight direction makes collaboration awkward.

      Select real mounting zones before the partition detail

      List display, bracket, camera, soundbar, whiteboard, marker rail, shelf and accessory weights and fixing patterns from current data. Show each permitted mounting zone and the substrate or reinforcement that supports it. Steelcase’s Serif whiteboard uses pre-drilled mounting holes and standoff mounts and publishes product weight by size; other boards and screens use different hardware. The appointed partition and structural specialists must verify the complete assembly. Avoid a continuous backing note that ignores fire, acoustic, deflection or service requirements. If product selection is not final, state the maximum design allowance and mounting envelope that procurement must not exceed without re-review.

          Coordinate power, data, cables and service access

          Map every outlet, data point, control, compute unit, camera, speaker and table connection. Show the route from floor, ceiling or riser to the wall and provide accessible draw points and service loops where the technology specialist requires them. Keep cables clear of board mounts and future writing-surface fixings. Decide whether equipment sits behind the display, in a ventilated wall box, in joinery or in a remote rack. Steelcase’s collaboration products demonstrate integrated cable housing and removable access as deliberate features. Do not seal transformers, connections or active equipment into an unventilated cavity. Qualified IT, AV and electrical teams remain responsible for their systems.

              Plan whiteboard use as carefully as screen viewing

              Set the writing surface from practical reach, marker tray and eraser access, furniture positions, wall protection and the lowest and highest useful writing zones. Check reflections from windows and lighting and whether a camera must capture content. Full-height magnetic or ceramic-steel surfaces, framed boards and mobile boards have different joints, thickness, weights and replacement methods. Confirm if magnets, projection or custom graphics are truly required and supported by the selected product. Separate the clean screen zone from marker use so hands, trays and erasers do not conflict with technology. Provide a cleaning and replacement strategy without making unsupported hygiene or durability claims.

                  Planning example

                  Planning example: a twelve-person project room needs a 75-inch display, camera, soundbar and two whiteboards. The first wall elevation centres everything between doors, but the display bracket misses the partition studs, a control cable crosses the whiteboard mounting zone and the lower board edge is blocked by a credenza. The revised brief adds verified backing, separates cable and fixing zones, moves the credenza, tests camera framing and lowers one writing surface for wider reach. A removable access route remains beside the display. This fictional scenario demonstrates coordination; it is not a fixing calculation, technology design or completed office project.

                      Design for replacement instead of one product generation

                      Displays, cameras and collaboration platforms change faster than partitions. Provide a rational mounting field, accessible pathway and finishing strategy that can accept a future bracket without leaving uncontrolled holes across the wall. Record the location and extent of backing and hidden services in handover drawings. Where a large proprietary frame is selected, check how panels and equipment are removed and whether the system can move or expand. Future-ready does not mean unlimited capacity; it means the known envelope, route and constraints are documented. Keep whiteboard modules replaceable where practical and store finish and product references for damaged panels or future extensions.

                          Checklist before partitions close

                          Review the final room layout, wall elevation, partition section and technology schematic together with the actual product schedule or controlled allowances.

                          • Confirm room activities, group size and furniture layout
                          • Test seated sightlines, camera framing and writing reach
                          • Record display, board, bracket and accessory sizes and weights
                          • Verify backing, studs, wall system and mounting zones
                          • Coordinate power, data, controls and cable pathways
                          • Provide ventilation and service access for active equipment
                          • Keep writing-surface fixings clear of hidden services
                          • Resolve reflections, lighting and background appearance
                          • Photograph backing and pathways before close-up
                          • Issue handover maps, manuals and future-change limits

                          Limitations and next step

                          This guide does not calculate structural capacity, certify partitions, design electrical or data systems, select AV products, confirm accessibility compliance or instruct mounting. The appointed workplace, partition, structural, electrical and technology specialists must verify the exact office and current products. Manufacturer pages describe particular systems and markets; confirm local supply and project suitability. The next step is a full wall elevation and section showing furniture, users, display, boards, backing, outlets, cable routes and access. Build or digitally test the most complex room, then photograph concealed provisions before closure. If procurement later changes size, weight or mounting, reopen the technical review instead of assuming the original backing covers every alternative.

                              Sources & further reading

                              Make this useful for your project.

                              A review of your property and priorities can turn general guidance into a defined brief.

                              Explore Workplace planningDiscuss your project
                              Return to the journal