Direct answer

An office egress and accessibility review should settle the occupancy assumptions, route from every occupied zone to the relevant exits, door and corridor interfaces, accessible journey through the workplace, level changes, reception and meeting-room approaches, furniture encroachment, emergency provisions and the information that must remain controlled after approval. It should occur before the test fit becomes a fixed commercial promise. Dubai Building Code, the UAE Fire and Life Safety Code framework and Dubai's accessibility guidance contain project-specific requirements; an appointed competent designer must interpret the current provisions for the building, occupancy and authority. This article is a briefing framework, not a compliance calculation.

Confirm the assumptions behind the plan

Record the proposed use of each room, maximum and typical occupancy, visitor numbers, operating pattern and any future growth allowance. Identify base-building exits, stairs, refuge or emergency provisions, rated elements and landlord information without assuming they can be moved or reclassified. A test fit that shows desks but omits occupancy assumptions cannot support a reliable route review. Where headcount or room use changes, the designer should recheck the consequences rather than treating the furniture swap as cosmetic.

  • Room use and occupant assumptions
  • Base-building fire and life-safety information
  • Current landlord and authority constraints
  • Visitors, contractors and after-hours use
  • Known growth or flexible-capacity scenarios

Trace routes with doors and furniture shown open

Review the continuous route rather than isolated corridor widths. Draw doors at their operating positions, chairs pulled back, storage doors open and loose furniture in realistic use. Check pinch points at reception, printer zones, meeting-room entries, tea points and dense benching. Confirm that routes do not rely on movable furniture staying perfectly aligned. The responsible fire and life-safety designer must determine travel paths, exit capacity and door requirements from current regulations and approved building information. The workplace plan should preserve those decisions in a form that interior designers and furniture suppliers can understand.

Map the accessible workplace journey

Follow a user from the building arrival point through reception, circulation, a representative workstation, meeting space, shared amenity and any other facility required by the brief and applicable code. Review door approaches, turning and transfer needs, controls, thresholds, floor surfaces, changes in level and furniture clearances. Dubai Municipality publishes the Dubai Universal Design Code and related accessibility guidance. The project team should use the current official requirements and involve qualified accessibility expertise where needed, rather than copying a dimension from another project.

Coordinate partitions, glazing and services

Layout approval must carry through to construction. Partition types, door sets, glazing manifestations, ceilings, security controls, access-control hardware, emergency devices, floor boxes and changes in finish can all affect the planned route or its usability. Identify which elements require specialist input and which interfaces cannot be changed without review. A late access-control reader or storage bank should not reduce a clear approach that existed on the test fit. Tie the approved plan to the door schedule, partition drawings, reflected ceiling plan and furniture layout through common revision control.

  • Door swing, hardware and access-control interfaces
  • Partition and glazing information
  • Emergency lighting, alarms and signage coordination
  • Floor boxes, thresholds and finish changes
  • Furniture and storage exclusion zones

Planning example

Planning example: a fictional office test fit adds six workstations and a small waiting area near a meeting suite. When chairs and the meeting-room door are drawn in use, the waiting seats constrict the principal circulation line and one planter occupies a necessary door approach. The team moves the waiting area into a wider reception bay, replaces the planter with a wall feature and records a no-furniture zone on the approved layout. The appointed designers then review the revised occupancy and route information against the building and current requirements. This example demonstrates coordination only; it does not establish compliance dimensions.

  • Furniture was tested in its occupied position
  • The accessible approach was treated as a controlled zone
  • Occupancy and routes were rechecked after the change
  • The final plan carried constraints into procurement

Checklist before layout approval

Use the checklist as an early design gate and retain the marked plan with the project record. Any later change affecting an item should return to the responsible reviewer.

  • Room uses and occupancy assumptions are explicit
  • Base-building exits and protected elements are verified
  • Routes are checked with doors and furniture in realistic use
  • Accessible journeys and door approaches are mapped
  • Level changes, surfaces and thresholds are identified
  • Partitions, glazing, services and security interfaces are coordinated
  • Specialist, landlord and authority review responsibilities are assigned
  • Controlled clear zones appear on the issued furniture plan

Limitations and next step

This article cannot calculate occupant load, travel distance, exit capacity, fire rating or accessibility compliance. Codes and authority procedures can change, and requirements depend on the exact building, occupancy and scope. Do not use the checklist as permission to modify life-safety systems or approved routes. The next step is to give the current test fit, occupancy schedule, base-building drawings and door information to the appointed fire-and-life-safety and accessibility reviewers. Resolve their comments before freezing partitions or furniture, then place the controlled routes and exclusion zones on the issued layout.

Sources & further reading

Make this useful for your project.

A review of your property and priorities can turn general guidance into a defined brief.

Explore Workplace planningDiscuss your project
Return to the journal