The direct answer
An office print, copy and resource-point brief should define who uses it, what tasks occur there, peak demand, equipment sizes, paper and consumable storage, mail or stationery functions, waste streams, privacy, acoustic impact, heat and ventilation, power and data, accessibility, cleaning and service access. The right answer may be one enclosed print room, several open resource points or a hybrid. Do not place a generic printer symbol in leftover circulation space. Map the real user journey and obtain current equipment data before the workplace layout is frozen. A well-positioned point shortens routine trips without turning focused work areas into queues or exposing confidential documents.
Measure tasks and demand
Start with current operating evidence: device count, monthly volumes, scan and finishing needs, peak periods, paper sizes, courier or mail activity, stationery replenishment and secure disposal. Ask which teams still depend on physical documents and which workflows are moving digital. A legal, finance or design team may create different demand from a mostly paperless sales team. Record whether staff collect output immediately, assemble document packs, handle deliveries or need a short standing surface. The brief should distinguish essential operations from historical habits so the new office is neither over-equipped nor inconvenient.
Choose location through user journeys
Plot walking routes from team neighbourhoods, meeting rooms, reception and support areas. A central point may reduce duplication, but one long journey across the floorplate can cause disruption. Several smaller points improve proximity but add equipment, supply and maintenance locations. Avoid narrowing egress or accessible routes and provide space for a user to approach, operate and step aside without blocking circulation. Consider after-hours access, visitor visibility and confidential output. The resource point should be easy for facilities staff and service technicians to reach without moving through sensitive rooms.
Control noise, heat and air
HSE display-screen guidance advises considering equipment heat and moving noise sources such as printers away from users, or using soundproofing where appropriate. HSE's workplace ventilation guidance also recommends identifying enclosed areas with poor ventilation and considering pollutants, heat and humidity created by work equipment. Apply those principles proportionately. A single low-use device differs from several high-volume machines in an enclosed room. Obtain manufacturer clearances, heat output, electrical, ventilation and servicing data for the actual equipment. Coordinate any enclosure with mechanical and acoustic specialists instead of relying on decorative cabinetry that could obstruct airflow or access.
Design storage and waste together
List the paper types, toner, envelopes, labels, stationery, trays, confidential-waste containers and recycling streams that must be accommodated. Give each a defined location and replenishment quantity. Closed storage reduces visual clutter, but heavy paper boxes need suitable shelves and handling access. Separate clean supplies from waste and keep spill or cleaning materials under facilities procedures. Avoid deep cupboards that conceal overstock. If the point handles incoming or outgoing mail, define sorting, temporary holding, security and collection. The finished elevation should show doors, drawers and bins open so their movement does not clash with users or circulation. Decide who owns consumable stock and how low-stock conditions are reported. A small labelled reserve can be more reliable than a large anonymous cupboard. If sensitive output is common, consider secure-release printing and a collection position that is visible to the user without exposing documents to passers-by.
Planning example
Planning example: a fictional sixty-person office initially places one large multifunction device beside twelve focused workstations. The operations review finds that most routine printing comes from two teams, while reception handles courier packs and confidential documents. The layout replaces the single exposed point with a central enclosed resource room near the two higher-use teams and a compact secure station behind reception. The central room includes current paper stock, a standing assembly surface, separate recycling and service clearance; acoustic and mechanical reviewers check the enclosure. A queue does not spill into the main corridor, and the focused desks no longer face the device. This is a planning example, not a fixed ratio.
Use a layout-freeze checklist
Resolve the operating brief and exact equipment information before partitions, power and ventilation are fixed.
- Record print, scan, finishing, mail and stationery demand by team.
- Obtain current equipment dimensions, clearances, heat, power, data and service needs.
- Map walking routes, peak queues and facilities access.
- Protect egress, accessible approach and corridor width.
- Review noise, ventilation and heat with the relevant specialists.
- Size paper, consumable, stationery, recycling and confidential-waste storage.
- Define security, cleaning, replenishment and post-installation verification.
Recognise the limitations
Usage data can change as teams grow or digitise workflows, so allow sensible flexibility rather than building tightly around one device. Manufacturer guidance and the responsible engineers determine technical clearances and connections. Equipment emissions, noise and ventilation should be assessed for the actual model and room; this article does not set exposure limits or replace a workplace risk assessment. Landlord, fire, accessibility, electrical, data-security and waste-management requirements may apply. Do not add power, data or ventilation as a do-it-yourself task. Confirm every service and enclosure with competent project specialists. Revisit the brief when equipment, headcount or document-security policy changes. A resource point that works on opening day may need adjustment as paper volume and team adjacencies evolve, so avoid irreversible joinery around replaceable equipment.
The next step
Build a resource-point schedule that lists users, tasks, peak demand, equipment, storage, waste, privacy, services and access for each proposed location. Test it on the workplace plan with circulation and facilities teams, then issue equipment data to the acoustic, mechanical, electrical and IT reviewers. Freeze partitions and joinery only after those comments are resolved. After installation, verify access, airflow, noise, network operation, supply storage and the collection process before the office move.
Sources & further reading
Make this useful for your project.
A review of your property and priorities can turn general guidance into a defined brief.
Explore Workplace planningDiscuss your project


