Direct answer

An office workstation ergonomics brief should translate real work patterns into furniture and equipment requirements before products are selected. It records users, tasks, screen count, laptop use, sitting and standing needs, adjustability, reach zones, lighting, power, data, accessories and support for individual assessment. It should define a representative mock-up and acceptance process rather than naming a premium chair and assuming the issue is solved. UAE occupational-safety guidance places responsibility on employers to consider workplace risks and provide suitable protection and information. The fit-out brief supports that duty but does not replace a qualified ergonomic or occupational-health assessment.

Start with tasks and attendance patterns

Describe what people actually do: focused screen work, calls, drawing review, writing, visitor conversations or frequent movement. Record typical daily duration, peak attendance, assigned versus shared seating and the equipment each role uses. A single laptop at a touchdown desk differs from two large monitors at an analyst position. Include employees who use assistive technology or have individual needs through an appropriate confidential process. Headcount alone is not enough. The brief should distinguish standard requirements from specialist adjustments so procurement remains consistent while allowing evidence-based exceptions.

Define the adjustment range

Specify what must adjust and how users understand it: seat height and depth, back support, armrests, desk height where applicable, monitor position and accessory placement. Avoid copying a single ideal posture into the specification because bodies and tasks vary. Product ranges should accommodate the intended user population and allow feet, legs, arms and screens to be positioned without avoidable strain. Where a standard item cannot cover a known need, create a specialist pathway. Record control location, adjustment effort and whether a shared user can reset the workstation quickly. A feature that is difficult to use may remain unused.

  • Chair adjustment range
  • Desk and work-surface options
  • Monitor and input-device positioning
  • Specialist exception route

Coordinate screens, devices and reach

List screen sizes, quantities, stands or arms, docks, keyboards, pointing devices, phones and task tools. Check that the work surface supports them without pushing the monitor too close or placing frequently used items outside a comfortable reach zone. Monitor arms need compatible desk construction, clamp space, load capacity and cable management. Shared desks need robust connectors and a simple setup that does not leave loose leads across the work surface. If staff use laptops for long screen-based work, the brief should address external input and display arrangements rather than treating the laptop alone as the complete workstation.

  • Screen count and mounting
  • Input devices
  • Docking and connections
  • Clear working area

Plan power, data and cable movement

Coordinate sockets, USB or approved charging, data connections and cable paths with the furniture’s full adjustment. Sit-stand desks and monitor arms move; cables need suitable length and containment without snagging or becoming trip hazards. Floor boxes, under-desk trays and screens must also align with the workstation grid and maintenance access. Electrical design and installation remain with qualified professionals. The furniture brief should identify devices, positions and movement so those professionals can design the service solution. Avoid a late collection of extension leads that undermines clear floors and makes shared desks frustrating to reset.

Planning example

A growing consultancy plans sixty shared workpoints for analysts, managers and visiting staff. The initial furniture package uses one fixed desk and chair type. Task interviews show that analysts need dual monitors for long sessions, managers use video calls and visitors mainly connect laptops briefly. The team keeps one desk family but provides compatible monitor arms at analyst zones, improved acoustic placement for calls, simple docks at shared positions and a qualified-assessment route for individual needs. A full workstation mock-up exposes a cable pinch when the desk rises, which is corrected before the bulk order. The brief improves fit without inventing medical claims.

  • Segment tasks, not status
  • Mock up the busiest workstation
  • Test full movement
  • Keep an individual-adjustment pathway

Review lighting and visual conditions

Position screens and work surfaces with the lighting and window strategy. Check direct glare, reflections, contrast and the ability to adjust blinds or local lighting through the relevant design team. A beautiful desk beside full-height glass may perform poorly at certain times of day. The workstation mock-up should be tested in representative daylight and artificial-light conditions, including screen use. Dubai’s green-building framework addresses building performance and occupant welfare at a broader level; the project lighting designer and workplace team should translate current requirements into the specific office. Furniture selection alone cannot correct an unsuitable visual environment.

  • Window and screen orientation
  • Glare and reflections
  • Task and ambient lighting
  • User-adjustable controls

Use a representative mock-up

Build at least one complete workstation with the real desk, chair, screen setup, dock, cables, accessories and surrounding clearances. Invite a representative user group and the relevant workplace or ergonomics specialist to test normal tasks and adjustments. Record observations against acceptance criteria rather than choosing by appearance. Test the shortest and tallest intended users through an appropriate process, plus shared-desk reset and cleaning. Revise product choices before the bulk order if controls, ranges or cable movement fail. Keep the approved configuration, settings guide and bill of materials so substitutions can be compared fairly.

  • Real products and devices
  • Representative users
  • Task-based testing
  • Recorded acceptance criteria

Procurement and handover checklist

The furniture schedule should state model, adjustment range, finish, accessories, compatibility, quantity, warranty information and approved substitutions. Confirm sample approval, delivery access, assembly, snagging and spare parts. At handover, train staff to adjust shared workstations and give managers a process for reporting discomfort or requesting assessment. Keep product instructions accessible and inspect moving parts periodically through the workplace maintenance plan. Do not label an office ergonomic solely because adjustable furniture was purchased. Usability depends on correct setup, work organisation, breaks, task variation and timely response to individual concerns.

  • Controlled furniture schedule
  • Substitution comparison
  • User adjustment guidance
  • Reporting and maintenance process

Limitations and occupational-health boundary

This article cannot diagnose pain, set medical restrictions or determine a compliant setup for every person. Employers should follow current UAE occupational-safety obligations and obtain qualified advice for risk assessment and individual cases. Product claims and generic posture diagrams do not replace observation of the work. Do not force an employee to disclose health information through an open design workshop; use appropriate confidential channels. Accessibility also concerns routes, controls, facilities and the wider workplace, not one desk. Coordinate the workstation brief with the Dubai built-environment and universal-design context through the appointed project professionals.

  • No medical diagnosis
  • No one-size-fits-all posture
  • Confidential individual pathway
  • Whole-workplace accessibility review

Suitable next step

Before issuing the furniture order, run a short task survey and build a complete workstation mock-up. Ask the workplace designer to issue a schedule covering users, tasks, adjustment ranges, screens, input devices, power, data, lighting interfaces, accessories and specialist exceptions. Test the mock-up with representative staff and qualified advice, correct cable and control problems, then lock the approved configuration. This produces a procurement package grounded in how the office works and gives the employer a clear handover route for adjustment, maintenance and future individual assessment.

  • Survey tasks and equipment
  • Specify adjustment ranges
  • Test a complete mock-up
  • Issue training and assessment routes

Sources & further reading

Make this useful for your project.

A review of your property and priorities can turn general guidance into a defined brief.

Explore Workplace planningDiscuss your project
Return to the journal