DESIGN STUDY / 01

A connected workplace

An original office design & fit-out concept exploring how material, proportion and practical use can work together.

A connected workplace — original design concept
Original design concept · Forma Workplaces

The brief

Workplaces designed around people, technology and the move-in programme. This study explores a setting where daily use and a clear visual language guide the design together.

The design thinking

Forma is the workplace specialist within Fitworks. We connect the needs of people with the realities of a floorplate, the technology they use and the programme needed to make a move work. The concept brings that approach into a spatial idea, using a restrained material palette and clear relationships between the main elements.

From concept to your property

A visual direction is the beginning of a conversation. Translating it into a project requires measured information, a site review, specialist coordination and an agreed specification.

  • Shell condition and workplace density
  • Meeting rooms and acoustic requirements
  • Furniture, IT and AV responsibilities
  • Phasing and move-in constraints
Develop a brief like this
THE STUDY IN DETAIL

The challenge behind the idea.

The workplace must coordinate acoustics, furniture, IT, AV and building services around the way each room is used.

Original design concept

Concept: workplace redesign

Balance concentration, conversation and teamwork with a plan based on actual work patterns rather than headcount alone.

Design decisions

  • Agree focus, meeting and support-space needs before the test fit.
  • Treat room privacy as a complete construction requirement.
  • Plan refurbishment phases and the move with the operating business.
PROPOSED PROJECT TIMELINE

From the first brief to handover.

A proposed sequence for this design study. External review periods, site conditions and supplier lead times are confirmed for each commissioned project. Some stages may overlap.

  1. Week 1

    Discovery & measured brief

    Balance concentration, conversation and teamwork with a plan based on actual work patterns rather than headcount alone.

    Review point · A scope and responsibility record
  2. Weeks 2–3

    Design & coordinated specification

    Agree focus, meeting and support-space needs before the test fit.

    Review point · A reviewed drawing and specification package
  3. Weeks 3–6

    Selections & procurement planning

    Treat room privacy as a complete construction requirement.

    Review point · A selection register and supply responsibilities
  4. Weeks 7–10

    Proposed delivery sequence

    Plan refurbishment phases and the move with the operating business.

    Review point · Staged inspections and change records
  5. Week 11

    Review & handover planning

    Review the agreed scope and record outstanding items before completion is accepted.

    Review point · A snagging list, care information and agreed close-out
SPECIFICATION & QUALITY

Details that can be reviewed.

Concept palette

  • Navy acoustic upholstery
  • Warm timber tables
  • Clear glass with considered privacy treatment

Proposed quality records

  • A workstyle and room-use brief
  • Furniture, IT and AV responsibility schedules
  • Agreed acoustic, service and occupation checks

The concept aims for a coordinated and usable space. Performance requirements, cost and completion milestones are agreed for each commissioned project.

Our project standards
YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your office design & fit-out brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry